Key points of construction of rubber water stop belt

2025-04-28


Before concrete pouring, the rubber water stop should be accurately fixed in the design position to avoid displacement or distortion. Special fixtures, rebar clamps or formwork may be used to ensure a tight bond with the concrete.

Positioning and fixing
Before concrete pouring, the rubber water stop should be accurately fixed in the design position to avoid displacement or distortion. Special fixtures, rebar clamps or formwork may be used to ensure a tight bond with the concrete.
Joint treatment
The joint of the rubber water stop belt should adopt the hot vulcanization bonding or cold bonding process to ensure that the strength of the joint is not less than 70% of the base metal, so as to avoid the hidden danger of leakage.
Concrete pouring
During the pouring process, attention should be paid to protect the rubber water stop belt to avoid sharp stones or steel bars piercing its surface. At the same time, the concrete should be vibrated in layers to ensure that it is fully bonded with the water stop belt.
Finished Product Protection
After the construction is completed, the rubber water stop belt should be protected to avoid direct sunlight, mechanical damage or chemical corrosion, which will affect its service life.

TAG:


Related News


Key points of construction of rubber water stop belt

Before concrete pouring, the rubber water stop should be accurately fixed in the design position to avoid displacement or distortion. Special fixtures, rebar clamps or formwork may be used to ensure a tight bond with the concrete.

Request Quote

We will contact you within one working day. Please pay attention to your email.

SUBMIT